49 to be exact, and that part of the connection between the house and the motor home is now finished. Getting the dirt underneath each paver perfectly level takes longer than you would expect, especially with all of the rocks in the ground. Today, I'll mix up a few bags of concrete, and connect the pavers with the footing, located just to the right of the motor home. The finishing touch will be some landscape gravel on both sides of the walkway, then, on to the next project.
Wednesday, December 18, 2013
LOTS OF SQUARES
49 to be exact, and that part of the connection between the house and the motor home is now finished. Getting the dirt underneath each paver perfectly level takes longer than you would expect, especially with all of the rocks in the ground. Today, I'll mix up a few bags of concrete, and connect the pavers with the footing, located just to the right of the motor home. The finishing touch will be some landscape gravel on both sides of the walkway, then, on to the next project.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment